Requests in five places
Email, front desk, phone, district representatives and social media. Each channel holds a piece and nobody sees the whole.
TITAN Road Management
Request management for municipal road departments. It brings requests from every channel together, organizes them by topic, district and road, tracks deadlines in business days and follows every case through to the response.
Blocked culvert on a rural road
Central districtGravel resurfacing request
North districtFallen tree on the road
South district01 / WHERE MOST TEAMS START
Most road departments run on email, paper and a spreadsheet. It works until volume grows and legal deadlines start to matter.
Email, front desk, phone, district representatives and social media. Each channel holds a piece and nobody sees the whole.
A spreadsheet never warns you that something is due. Delays surface when the complaint arrives.
Every report to the council or the road board takes days of counting and starts over next month.
02 / FOLLOW A REQUEST
Pick a stage to see what the system does and what gets recorded. Example with fictional data.
Email, front desk, phone, district representative or WhatsApp. TITAN Road Management creates the request code, records channel and date, and sends an acknowledgment with the response deadline.
It reads the text, voice note or photo, keeps personal data out of the description and checks whether the same place was already reported. Coordination confirms the suggestion before it counts in the indicators.
Coordination assigns by each technician’s workload or reassigns in bulk. The technician gets a notice and finds the case in My requests, on their phone.
The technician schedules the visit and records the result from their phone. AI orders the daily route with nearby cases, photos carry their location and the case appears on the map alongside the geological and road layers the municipality enables.
AI drafts the response and the official letter from the case history. The department reviews, signs and delivers it through the resident’s chosen channel. If information is missing, the request moves to On hold and the clock stops with the reason recorded.
Every closed case adds to reports by district, topic, road and person. Leadership arrives at council and road board meetings with today’s figures, not a manual count.
Illustrative example. Codes, districts and people are fictional.
03 / WHAT IT LOOKS LIKE
Technicians receive their cases and record inspections from the field. From what they report, AI builds the monthly report for leadership to review and sign.
My requests
Technician 2 · 5 for today
Blocked culvert
Road C-112Blocked ditch
Road C-215Partial landslide
Road C-087Record inspection
Location recorded on every photo
Collapsed culvert, water over the road
High · only access road
Road department monthly report
October 2026 · Draft
Requests by district
Requests per month
September rains drove up culvert reports in the North district. Road C-087 has four landslides in two years and a lasting intervention is recommended.
Leadership reviews and signs before sending it to council.04 / WHAT IT DOES
Eight capabilities so every request has an owner, a date and evidence, and leadership sees the real state of the department without asking for a report.
Explore the TITAN ecosystemEmail, front desk, phone, district representatives and WhatsApp arrive in one place. Every request gets a code and the resident receives an acknowledgment with the response deadline.
AI suggests topic, district and road from the text and keeps personal data in its own fields. Coordination confirms or corrects, and only confirmed data counts in the reports.
The status light skips weekends, public holidays, local holidays and office closures. Each topic has its own deadline and the municipality defines when the clock starts. On hold stops the clock with a reason.
Open and overdue requests by person, bulk reassignment and assignment notices by email or WhatsApp. Each technician has a My requests view to report progress without going through the office.
Scheduled inspections, geotagged photos and road codes. Every request has its point on the map, next to the GIS layers the municipality enables, such as the local road network.
The response stays linked to its official letter and is delivered through the resident’s chosen channel. Voiding or reopening requires a note, and every change stays in the history.
Requests by district, topic, road and person, response times with the number of cases behind them and monthly trends. Built for road boards and district councils.
It imports your current log, flags what needs review and keeps historical records apart until they are cleaned up. Indicators count from the start date the department defines.
05 / DATA-FIRST × AI-FIRST
TITAN Road Management is built on a data model of the road network. Every request is tied to a road, a district, a location and an owner. AI uses that context to read, merge, prioritize and draft, and everything it suggests stays labeled until a person confirms it.
Which roads have the most culvert reports this year?
AI-FIRST · AI AT EVERY STAGE
Text, WhatsApp voice notes, photos and attached documents. It extracts the place, the road, the type of problem and the contact.
Ten neighbors report the same landslide. AI recognizes a single case by location, topic and description, and proposes merging them.
It weighs risk to people, whether it is the only access road, proximity to schools or clinics and the rainy season.
It describes the damage, such as a pothole, landslide, blocked ditch or collapsed culvert, and suggests its severity to order the schedule.
It drafts from the case history, earlier responses and the regulations the municipality uploads. A person reviews and signs.
Whoever receives a reassigned case reads in seconds what happened, what is missing and what is due.
DATA-FIRST · DATA AS THE FOUNDATION
Local road inventory code, district and coordinates. What used to live in free text can now be counted.
What AI proposes and what a person confirms are stored separately, with their source. Reports use confirmed data only.
A heat map by road and district shows where reports repeat, as input for road board planning.
It compares against history to anticipate rainy-season peaks and get crews and machinery ready in time.
A dashboard shows how many requests lack a district, road or contact, and helps complete them.
Exports and API connections to the municipal GIS and institutional systems, with the same traceability.
AI TO PLAN AND REPORT
Groups nearby cases and proposes the visit order for crews and inspectors.
From the inspection, it estimates ditch length, gravel and machine hours to plan the work.
Spots roads with repeated reports of the same kind and recommends moving from spot repairs to a lasting intervention.
Compares photos taken before and after the work and keeps the evidence in the case.
Builds the monthly report for council and the road board with text, figures and maps. Leadership reviews and signs it.
The Agentic Assistance answers on WhatsApp how each report is going, using TITAN Road Management data.
06 / TERRITORY IN REAL TIME
TITAN Road Management connects to geological, weather and road systems. With that real-time data, AI combines rainfall, hazards and each road’s history, and flags where to look before the complaint arrives.
Swipe to explore the map.
Hourly and daily totals from enabled weather stations, on the road map.
Magnitude and location of earthquakes that may affect slopes, bridges and culverts.
Landslide, flood, slope and soil layers, with the same geological context as GeoFactibilidad.
Code, surface, length and condition of every road in the inventory, linked to each request.
Position and progress of municipal machinery when it has GPS, to know what is being handled today.
Road closures and emergency responses on one map, ready to notify residents.
North district · 92 mm of rain in 24 hours
AI suggests inspecting C-087 and C-140 early tomorrow and getting the backhoe ready.
07 / ROAD NETWORK AND INVESTMENT
Inventory, condition, investment, machinery and budget in the same system that receives requests. The department knows what it has, what condition it is in, how much it has invested and where to invest next.
Road record
Local road · North district
Condition by section
Intervention history
Pothole repair and ditch cleaning
₡6,4 MFull gravel resurfacing
₡18,2 MCulvert reconstruction
₡9,8 MRoadway grading
₡14,2 MAI detects four landslides in two years and suggests assessing the slope on section 4.
Where to invest first
Priority score from 0 to 100
It combines condition, traffic, connectivity, risk and reports. The municipality sets the weight of each criterion and the road board decides.
Five-year road maintenance plan
Proposal 2027 to 2031
| Road | 2027 | 2028 | 2029 | 2030 | 2031 |
|---|---|---|---|---|---|
| C-087 | |||||
| C-140 | |||||
| C-112 | |||||
| C-215 | |||||
| C-033 |
It is built from the condition, priority and estimated cost of each project. The road board adjusts it and proposes it to the municipal council.
Machinery control
November 2026
| Equipment | Hours this month | Fuel | Efficiency | Location | Status |
|---|---|---|---|---|---|
| Backhoe 02 | 126 h | 410 L | 3,3 L/h | C-112 | Working |
| Grader 01 | 98 h | 520 L | 5,3 L/h | C-140 | High fuel use |
| Dump truck 05 | 142 h | 690 L | 4,9 L/h | Yard | Available |
| Roller 03 | 34 h | 120 L | 3,5 L/h | Workshop | Maintenance |
AI flags that Grader 01 is using 18% more fuel than its average and suggests a check.
Budget execution 2026
Local road network funds
AI projects Rehabilitation will close the year at 71% and suggests rescheduling two projects.
Length, surface, width, condition, bridges, culverts and ditches for every road, with its code and its route on the map.
Deterioration, potholes, drainage, bridges and culverts assessed by section, with field photos and AI to classify the damage.
A score per road that combines condition, traffic, connectivity, risk and reports to decide where to invest first.
What was done on each road, when, with which machinery and how much was invested, from the first recorded intervention.
Preventive, periodic and rehabilitation maintenance scheduled over several years, as the basis of the five-year road maintenance plan.
Hours worked, fuel, efficiency, maintenance and location for every machine, with alerts for unusual fuel use.
Every intervention linked to its budget line and its financial execution, with progress by program and underspending alerts.
08 / WHO IT IS FOR
Sees what is due today, where work piles up and arrives at every meeting with current reports.
Records, triages and assigns in minutes, with each person’s workload in view.
Receive their cases on their phone and report inspections with photos and location from the field.
Review figures by district and road without requesting a new report every time.
09 / DATA AND CONTROL
Requests carry residents’ names, ID numbers and addresses. TITAN Road Management limits who can see them, logs every action and leaves decisions with those who hold authority.
Leadership, coordination, technicians and read-only users see what their role needs. The general list never shows ID numbers or phone numbers.
Changes, lookups and exports are recorded with person and time. A redacted export is available.
AI suggests and organizes. Assigning, responding, voiding and closing are always done by an authorized person.
10 / PART OF THE TITAN ECOSYSTEM
Takes the report on WhatsApp, gathers the details and hands it over as a request. The conversation belongs to the Assistance layer, the request to TITAN Road Management.
Learn moreTakes inspections to the field with evidence linked to the case and its location.
Learn moreShares records, documents and signatures with land use, business licensing and the other modules.
Learn moreProvides the geological context and municipal GIS layers to read the terrain around every road.
Learn moreREFERENCE CASE
The road management unit of the Municipality of Puriscal in Costa Rica moved its request log to TITAN Road Management. Puriscal also runs TITAN for land use, business licensing and field inspections, and the Agentic Assistance on WhatsApp.
11 / FREQUENTLY ASKED QUESTIONS
What department heads usually ask before leaving the spreadsheet behind.
In Costa Rica, the Unidad Técnica de Gestión Vial (UTGV) is the municipal unit that plans and carries out maintenance of the local road network and handles resident requests about roads, culverts, driveways and road encroachments. It works with the local road board, which proposes road maintenance plans to the municipal council.
No. TITAN Road Management imports your current log, flags what needs review and keeps historical records apart until they are cleaned up. Indicators count from the start date your department defines.
In business days, excluding weekends, public holidays, local holidays and office closures. The municipality sets the deadline for each topic and the day the clock starts, according to its legal criteria.
The request moves to On hold with the reason recorded, and the clock stops until the requested information arrives. Everything stays in the history.
No. Each technician sees their requests on their phone, records inspections with photos and location, and reports progress without depending on the office.
Yes, with the GIS layers the municipality enables, such as the local road network. Every request can carry its road code and its point on the map.
From the sources the municipality enables, such as weather stations, seismic records, geological and hazard layers, the road inventory and machinery GPS. Each connection is configured and validated according to each institution’s availability and authorization.
Only authorized roles. The general list does not show ID numbers or phone numbers, every lookup and export is logged, and a redacted export is available.
No. AI reads, merges, prioritizes and drafts. Every suggestion is labeled as such and only counts once a person confirms it. Assigning, responding and closing are always done by someone with authority.
Models are chosen by task, as in the rest of the TITAN ecosystem. Reading a voice note, interpreting a photo and drafting a letter have different needs, and each workflow uses the model configured for that task.
Yes. The inventory, section-by-section condition and intervention history feed a priority score and a multi-year plan. The road board adjusts the proposal, the municipal council approves it and every intervention stays linked to its budget and execution.
It is designed for road management, but the same model of topics, deadlines and owners can be configured for other departments that receive resident requests.
TITAN ROAD MANAGEMENT / REQUEST TRACKING FOR ROAD DEPARTMENTS
Bring your current log, even if it is a spreadsheet. We will show you how it looks organized by topic, district and deadline, and what your team would need to confirm.
Show me with our own log [email protected]Review TicoNeural’s technical credentials and the public product brief before discussing your implementation.
View verified credentials (Spanish) · Read the public product brief
TicoNeural
We reply on WhatsApp
Hi, thanks for visiting TicoNeural. How can we help?
Send us a message and the conversation continues on WhatsApp with our team.
Official WhatsApp +506 6240 0831