Skip to content
TicoNeural Key
TicoNeural
AI INFRASTRUCTURE FOR GOVERNMENTS & ORGANIZATIONS
TicoNeural / TITAN ECOSYSTEM

TITAN Road Management

Every road request with an owner, a deadline and evidence. Your team knows what is due today.

Request management for municipal road departments. It brings requests from every channel together, organizes them by topic, district and road, tracks deadlines in business days and follows every case through to the response.

Data-firstAI-firstReal timeBusiness daysStatus lightField and mapDistrict reports
Road department dashboardFictional data
Open48
On time41
Due soon5
Overdue2
  • UTGV-2026-0418

    Blocked culvert on a rural road

    Central district
    Due today
  • UTGV-2026-0415

    Gravel resurfacing request

    North district
    On time · 6 days
  • UTGV-2026-0409

    Fallen tree on the road

    South district
    Answered
Median response over 90 days · 6 business days · 112 cases
ONE RECORD FOR
Email
Front desk
Phone
District reps
WhatsApp

01 / WHERE MOST TEAMS START

A spreadsheet never warns you
when something is due.

Most road departments run on email, paper and a spreadsheet. It works until volume grows and legal deadlines start to matter.

01

Requests in five places

Email, front desk, phone, district representatives and social media. Each channel holds a piece and nobody sees the whole.

02

Deadlines nobody measures

A spreadsheet never warns you that something is due. Delays surface when the complaint arrives.

03

Reports built by hand

Every report to the council or the road board takes days of counting and starts over next month.

02 / FOLLOW A REQUEST

From a WhatsApp report
to a closed, measured case.

Pick a stage to see what the system does and what gets recorded. Example with fictional data.

01 · Intake

The request arrives through any channel and gets its code.

Email, front desk, phone, district representative or WhatsApp. TITAN Road Management creates the request code, records channel and date, and sends an acknowledgment with the response deadline.

WHAT GETS RECORDED
  • Code UTGV-2026-0418
  • Channel WhatsApp
  • Acknowledgment sent to the resident
02 · Triage

AI reads the report and suggests topic, road and priority. A person confirms.

It reads the text, voice note or photo, keeps personal data out of the description and checks whether the same place was already reported. Coordination confirms the suggestion before it counts in the indicators.

WHAT GETS RECORDED
  • Topic Culverts and ditches
  • Road C-112 · High priority
  • Merged with 2 reports of the same place
03 · Assignment

It reaches the right person, with team workload in view.

Coordination assigns by each technician’s workload or reassigns in bulk. The technician gets a notice and finds the case in My requests, on their phone.

WHAT GETS RECORDED
  • Assigned to Technician 2
  • Deadline of 10 business days
  • Assignment notice sent
04 · Field

The inspection is recorded with photos, location and road code.

The technician schedules the visit and records the result from their phone. AI orders the daily route with nearby cases, photos carry their location and the case appears on the map alongside the geological and road layers the municipality enables.

WHAT GETS RECORDED
  • Inspection completed
  • 3 geotagged photos
  • Point on the map
05 · Response

The response goes out with its official letter and reaches the resident.

AI drafts the response and the official letter from the case history. The department reviews, signs and delivers it through the resident’s chosen channel. If information is missing, the request moves to On hold and the clock stops with the reason recorded.

WHAT GETS RECORDED
  • Letter UTGV-OF-0231-2026
  • Response delivered
  • Full history
06 · Insight

The case closes and feeds the monthly reports.

Every closed case adds to reports by district, topic, road and person. Leadership arrives at council and road board meetings with today’s figures, not a manual count.

WHAT GETS RECORDED
  • Closed in 6 business days
  • Monthly report updated
  • No manual count

Illustrative example. Codes, districts and people are fictional.

03 / WHAT IT LOOKS LIKE

From the technician’s phone
to the council report.

Technicians receive their cases and record inspections from the field. From what they report, AI builds the monthly report for leadership to review and sign.

My requests

Technician 2 · 5 for today

  • UTGV-2026-0418

    Blocked culvert

    Road C-112
    Due today
  • UTGV-2026-0421

    Blocked ditch

    Road C-215
    On time
  • UTGV-2026-0409

    Partial landslide

    Road C-087
    Overdue

Record inspection

Location recorded on every photo

Observed damage Suggested by AI

Collapsed culvert, water over the road

Severity Suggested by AI

High · only access road

Send update
Technician view. Illustration with fictional data.

Road department monthly report

October 2026 · Draft

Drafted by AI
Received126
Answered on time91 %
Median response6 days
Warnings handled4

Requests by district

  • Central48
  • North37
  • South26
  • West15

Requests per month

May · 82Jun · 95Jul · 88Aug · 110Sep · 131Oct · 126 126 MayJunJulAugSepOct

September rains drove up culvert reports in the North district. Road C-087 has four landslides in two years and a lasting intervention is recommended.

Leadership reviews and signs before sending it to council.
Report for council and the road board. Illustration with fictional data.

04 / WHAT IT DOES

Logging is easy.
Meeting the deadline is what counts.

Eight capabilities so every request has an owner, a date and evidence, and leadership sees the real state of the department without asking for a report.

Explore the TITAN ecosystem
Single intake · Acknowledgment

One record for every channel.

Email, front desk, phone, district representatives and WhatsApp arrive in one place. Every request gets a code and the resident receives an acknowledgment with the response deadline.

AI with confirmation

Assisted triage, human decision.

AI suggests topic, district and road from the text and keeps personal data in its own fields. Coordination confirms or corrects, and only confirmed data counts in the reports.

Business days · Status light

Business-day deadlines you can see.

The status light skips weekends, public holidays, local holidays and office closures. Each topic has its own deadline and the municipality defines when the clock starts. On hold stops the clock with a reason.

Assignment · My requests

Team workload in plain sight.

Open and overdue requests by person, bulk reassignment and assignment notices by email or WhatsApp. Each technician has a My requests view to report progress without going through the office.

Inspection · GIS

Field work and map in the same case.

Scheduled inspections, geotagged photos and road codes. Every request has its point on the map, next to the GIS layers the municipality enables, such as the local road network.

Official letter · Notice

Responses with an official letter and resident notice.

The response stays linked to its official letter and is delivered through the resident’s chosen channel. Voiding or reopening requires a note, and every change stays in the history.

Indicators · Accountability

Reports ready for council.

Requests by district, topic, road and person, response times with the number of cases behind them and monthly trends. Built for road boards and district councils.

Assisted migration

Start from your spreadsheet.

It imports your current log, flags what needs review and keeps historical records apart until they are cleaned up. Indicators count from the start date the department defines.

05 / DATA-FIRST × AI-FIRST

AI is not bolted on at the end.
It works at every stage, on data you can audit.

TITAN Road Management is built on a data model of the road network. Every request is tied to a road, a district, a location and an owner. AI uses that context to read, merge, prioritize and draft, and everything it suggests stays labeled until a person confirms it.

Ask your dataFictional data

Which roads have the most culvert reports this year?

  1. C-112 · Central district14
  2. C-087 · North district9
  3. C-215 · South district6
Calculated on confirmed data. The answer shows the query it used.

AI-FIRST · AI AT EVERY STAGE

Reads whatever arrives

Text, WhatsApp voice notes, photos and attached documents. It extracts the place, the road, the type of problem and the contact.

Merges repeated reports

Ten neighbors report the same landslide. AI recognizes a single case by location, topic and description, and proposes merging them.

Suggests priority

It weighs risk to people, whether it is the only access road, proximity to schools or clinics and the rainy season.

Interprets field photos

It describes the damage, such as a pothole, landslide, blocked ditch or collapsed culvert, and suggests its severity to order the schedule.

Drafts responses and letters

It drafts from the case history, earlier responses and the regulations the municipality uploads. A person reviews and signs.

Summarizes every case

Whoever receives a reassigned case reads in seconds what happened, what is missing and what is due.

DATA-FIRST · DATA AS THE FOUNDATION

Every request tied to a road

Local road inventory code, district and coordinates. What used to live in free text can now be counted.

Suggested and confirmed, kept apart

What AI proposes and what a person confirms are stored separately, with their source. Reports use confirmed data only.

Roads that keep failing

A heat map by road and district shows where reports repeat, as input for road board planning.

Seasonal trends

It compares against history to anticipate rainy-season peaks and get crews and machinery ready in time.

Data quality in plain sight

A dashboard shows how many requests lack a district, road or contact, and helps complete them.

Clean data out

Exports and API connections to the municipal GIS and institutional systems, with the same traceability.

AI TO PLAN AND REPORT

Daily route

Groups nearby cases and proposes the visit order for crews and inspectors.

Materials and machinery

From the inspection, it estimates ditch length, gravel and machine hours to plan the work.

From patch to lasting fix

Spots roads with repeated reports of the same kind and recommends moving from spot repairs to a lasting intervention.

Before and after

Compares photos taken before and after the work and keeps the evidence in the case.

Report ready for review

Builds the monthly report for council and the road board with text, figures and maps. Leadership reviews and signs it.

Status for residents

The Agentic Assistance answers on WhatsApp how each report is going, using TITAN Road Management data.

06 / TERRITORY IN REAL TIME

Connected to the territory.
AI sees the problem coming.

TITAN Road Management connects to geological, weather and road systems. With that real-time data, AI combines rainfall, hazards and each road’s history, and flags where to look before the complaint arrives.

Road department operations map
Fictional map with roads, districts, requests by status, rainfall, hazard zones and the route of a backhoe. NORTH DISTRICT CENTRAL DISTRICT WEST DISTRICT SOUTH DISTRICT High landslide hazard 92 mm in 24 h C-112C-087C-140C-215 Municipal yard Backhoe 02 !!! N 1 km

Swipe to explore the map.

OverdueDue soonOn timeAnswered High hazard Accumulated rain Machinery route Early warning
Illustration with fictional data. Layers depend on the sources each municipality enables.

Real-time rainfall

Hourly and daily totals from enabled weather stations, on the road map.

Recent earthquakes

Magnitude and location of earthquakes that may affect slopes, bridges and culverts.

Geology and hazards

Landslide, flood, slope and soil layers, with the same geological context as GeoFactibilidad.

Local road network

Code, surface, length and condition of every road in the inventory, linked to each request.

Machinery on the move

Position and progress of municipal machinery when it has GPS, to know what is being handled today.

Closures and emergencies

Road closures and emergency responses on one map, ready to notify residents.

Early warningFictional data

North district · 92 mm of rain in 24 hours

  • High landslide hazard zone
  • C-087 with 4 landslide reports in two years
  • Only access road to the district school

AI suggests inspecting C-087 and C-140 early tomorrow and getting the backhoe ready.

Leadership confirms the order
Illustrative example. Sources are connected according to each institution’s availability and authorization.

07 / ROAD NETWORK AND INVESTMENT

From handling reports
to managing the whole road network.

Inventory, condition, investment, machinery and budget in the same system that receives requests. The department knows what it has, what condition it is in, how much it has invested and where to invest next.

C-087

Road record

Local road · North district

Fair condition
Length
4,2 km
Surface
Gravel
Average width
5,5 m
Bridges
1
Culverts
14
Ditches
6,8 km

Condition by section

GoodFairPoor

Intervention history

  • 2026

    Pothole repair and ditch cleaning

    ₡6,4 M
  • 2025

    Full gravel resurfacing

    ₡18,2 M
  • 2023

    Culvert reconstruction

    ₡9,8 M
  • 2021

    Roadway grading

    ₡14,2 M
Total invested since 2021₡48,6 M

AI detects four landslides in two years and suggests assessing the slope on section 4.

Where to invest first

Priority score from 0 to 100

Calculated by AI
  1. 1C-08792
    Poor conditionOnly access4 landslides
  2. 2C-14081
    High trafficRainy area
  3. 3C-11274
    Main routeRepeated reports
  4. 4C-21558
    Fair condition
  5. 5C-03341
    Good condition

It combines condition, traffic, connectivity, risk and reports. The municipality sets the weight of each criterion and the road board decides.

Five-year road maintenance plan

Proposal 2027 to 2031

Proposed by AI
Road20272028202920302031
C-087RehabilitationPreventivePeriodic
C-140PreventivePeriodicPreventive
C-112RehabilitationPeriodic
C-215PeriodicPreventivePreventive
C-033PreventivePeriodic
PreventivePeriodicRehabilitation

It is built from the condition, priority and estimated cost of each project. The road board adjusts it and proposes it to the municipal council.

Machinery control

November 2026

EquipmentHours this monthFuelEfficiencyLocationStatus
Backhoe 02126 h410 L3,3 L/hC-112Working
Grader 0198 h520 L5,3 L/hC-140High fuel use
Dump truck 05142 h690 L4,9 L/hYardAvailable
Roller 0334 h120 L3,5 L/hWorkshopMaintenance

AI flags that Grader 01 is using 18% more fuel than its average and suggests a check.

Budget execution 2026

Local road network funds

Spent54 %
  • Routine maintenance₡236 M of ₡320 M
    74 %
  • Rehabilitation₡181 M of ₡410 M
    44 %
  • Emergencies₡72 M of ₡90 M
    80 %
  • Bridges and culverts₡39 M of ₡150 M
    26 %
Total spent₡528 M of ₡970 M

AI projects Rehabilitation will close the year at 71% and suggests rescheduling two projects.

Illustration with fictional data. Every intervention is linked to its road, its machinery and its budget line.

Road inventory

Length, surface, width, condition, bridges, culverts and ditches for every road, with its code and its route on the map.

Condition assessment

Deterioration, potholes, drainage, bridges and culverts assessed by section, with field photos and AI to classify the damage.

Investment prioritization

A score per road that combines condition, traffic, connectivity, risk and reports to decide where to invest first.

Intervention history

What was done on each road, when, with which machinery and how much was invested, from the first recorded intervention.

Multi-year planning

Preventive, periodic and rehabilitation maintenance scheduled over several years, as the basis of the five-year road maintenance plan.

Machinery control

Hours worked, fuel, efficiency, maintenance and location for every machine, with alerts for unusual fuel use.

Budget tracking

Every intervention linked to its budget line and its financial execution, with progress by program and underspending alerts.

08 / WHO IT IS FOR

Everyone sees
what they need to move forward.

Department leadership

Sees what is due today, where work piles up and arrives at every meeting with current reports.

Coordination and front desk

Records, triages and assigns in minutes, with each person’s workload in view.

Technicians and inspectors

Receive their cases on their phone and report inspections with photos and location from the field.

Mayor’s office, council and road board

Review figures by district and road without requesting a new report every time.

09 / DATA AND CONTROL

The system organizes.
Your department decides.

Requests carry residents’ names, ID numbers and addresses. TITAN Road Management limits who can see them, logs every action and leaves decisions with those who hold authority.

Role-based access

Leadership, coordination, technicians and read-only users see what their role needs. The general list never shows ID numbers or phone numbers.

A log of every action

Changes, lookups and exports are recorded with person and time. A redacted export is available.

Decisions stay with the department

AI suggests and organizes. Assigning, responding, voiding and closing are always done by an authorized person.

10 / PART OF THE TITAN ECOSYSTEM

Not a standalone tool.
It connects to what already runs.

REFERENCE CASE

The road management unit of the Municipality of Puriscal in Costa Rica moved its request log to TITAN Road Management. Puriscal also runs TITAN for land use, business licensing and field inspections, and the Agentic Assistance on WhatsApp.

11 / FREQUENTLY ASKED QUESTIONS

“How would we start
without slowing down?”

What department heads usually ask before leaving the spreadsheet behind.

What is a road management unit (UTGV)?

In Costa Rica, the Unidad Técnica de Gestión Vial (UTGV) is the municipal unit that plans and carries out maintenance of the local road network and handles resident requests about roads, culverts, driveways and road encroachments. It works with the local road board, which proposes road maintenance plans to the municipal council.

Do we have to drop our spreadsheet overnight?

No. TITAN Road Management imports your current log, flags what needs review and keeps historical records apart until they are cleaned up. Indicators count from the start date your department defines.

How are deadlines counted?

In business days, excluding weekends, public holidays, local holidays and office closures. The municipality sets the deadline for each topic and the day the clock starts, according to its legal criteria.

What if we are waiting on the resident?

The request moves to On hold with the reason recorded, and the clock stops until the requested information arrives. Everything stays in the history.

Do technicians need a computer?

No. Each technician sees their requests on their phone, records inspections with photos and location, and reports progress without depending on the office.

Does it connect with our map?

Yes, with the GIS layers the municipality enables, such as the local road network. Every request can carry its road code and its point on the map.

Where does the real-time data come from?

From the sources the municipality enables, such as weather stations, seismic records, geological and hazard layers, the road inventory and machinery GPS. Each connection is configured and validated according to each institution’s availability and authorization.

Who can see personal data?

Only authorized roles. The general list does not show ID numbers or phone numbers, every lookup and export is logged, and a redacted export is available.

Does AI make decisions on its own?

No. AI reads, merges, prioritizes and drafts. Every suggestion is labeled as such and only counts once a person confirms it. Assigning, responding and closing are always done by someone with authority.

Which AI models does it use?

Models are chosen by task, as in the rest of the TITAN ecosystem. Reading a voice note, interpreting a photo and drafting a letter have different needs, and each workflow uses the model configured for that task.

Does it help plan road investment?

Yes. The inventory, section-by-section condition and intervention history feed a priority score and a multi-year plan. The road board adjusts the proposal, the municipal council approves it and every intervention stays linked to its budget and execution.

Is it only for road departments?

It is designed for road management, but the same model of topics, deadlines and owners can be configured for other departments that receive resident requests.

TITAN ROAD MANAGEMENT / REQUEST TRACKING FOR ROAD DEPARTMENTS

How many requests
are due today in your department?

Bring your current log, even if it is a spreadsheet. We will show you how it looks organized by topic, district and deadline, and what your team would need to confirm.

Show me with our own log [email protected]

A clear offering. Evidence you can review.

Review TicoNeural’s technical credentials and the public product brief before discussing your implementation.

View verified credentials (Spanish) · Read the public product brief